A totally different way of working. Out went the rule book.

No time to prepare tender drawings. Construction had to happen based on my sketches alone.

I needed to focus on the design, find the materials that were local. No time to order anything.

Looking around at what was available I designed with multiples of simple elements.

Standard timber moulding lengths were available so I cut them into 300mm lengths and had them made up into wall panels.

This was a super fast-track project, we learned a lot and we got the job done. I cost about three times what it would normally but that was our client's choice!